A design & build project in collaboration with Aurecon to deliver one of the most demanding flood protection projects to an international client. Specifications were stringent including zero tolerance of vibration in the course of construction inside a factory of 40,000 employees.
Scope of works includes the construction of a flood wall, 16 flood gates, a pumping system and valves of other measures for the existing drainage opening and other utilities that will cross the wall. The perimeter of the site is approximately 2,323 m long and the flood wall is a heavily reinforced concrete of 2.5 m high.